Repair of Heel Kerbs at Grangemouth Substation

At Grangemouth Substation the team at MCS were tasked with repairing broken heel kerbs at access road to the substation. Below are some examples of the steps we had taken to installing and reinstating.

Removing broken kerbs.
Excavating and pinning out to lay kerbs.
Install of kerbs.
Grading windust to formation level..